Make a segment of normal or conductive wire connect to machines until it's just below its capacity (1k or 2k, respectively). The thing you need to do is use less heavy-watt all over the place and use more transformers. Even one small wire connected to a segment of bigger wire will cause overloads. You've got all your small and big wires crossed. I think you're still not quite understanding something.